SUCCESS STORY | INFRASTRUCTURE | TRANSPORT TERMINAL

Tanah Merah Ferry Terminal

Himel HAVSP Smart Pump Series VSDs · Chilled-Water & Condenser-Water Pumps

2025 Project year
Sector
Infrastructure
Client
Singapore Cruise Centre
Application
VSD Replacement — Chilled-Water & Condenser-Water Pumps
Solution
Himel HAVSP VSDs · Testing & Commissioning

Tanah Merah Ferry Terminal required an upgrade of its existing VSD installation serving the chilled-water and condenser-water pumps. Trans-Digi supplied, tested and commissioned Himel HAVSP Smart Pump Series VSDs, providing a more cost-effective replacement solution while supporting the terminal’s critical cooling infrastructure.

Project Overview

Tanah Merah Ferry Terminal is a major passenger ferry gateway serving regional routes from Singapore. As part of the terminal’s upgrading works, the existing VSDs controlling its chilled-water and condenser-water pumps were identified for replacement.

The requirement was for a more cost-effective VSD solution capable of reliably operating the existing pump systems while reducing ongoing maintenance requirements. The replacement also needed to integrate efficiently into the existing installation.

Solution Provided

Trans-Digi supplied Himel HAVSP Smart Pump Series VSDs for the chilled-water and condenser-water pump applications, together with testing and commissioning.

The HAVSP’s compact footprint helped simplify replacement of the existing European-brand VSDs within the available installation space. The replacement arrangement also enabled the project team to optimise cable requirements, helping reduce installation costs.

Following installation, Trans-Digi completed testing and commissioning to verify correct VSD operation and ensure the pump systems were ready for handover.

Replaced

Existing European-brand VSDs

Existing chilled-water & condenser-water pump installation

Upgraded to

New installation

Himel HAVSP Smart Pump Series VSDs

Tested & commissioned

Retrofit

VSD Upgrade Within Existing Terminal Infrastructure

The project required the new VSDs to integrate with the terminal’s existing chilled-water and condenser-water pump systems while minimising modification to the installed infrastructure. The Himel HAVSP solution supported a straightforward retrofit approach and efficient project execution.

Key Project Highlights

Existing VSD installation upgraded to Himel HAVSP Smart Pump Series VSDs

Chilled-water and condenser-water pump applications serving the ferry terminal

Compact drive footprint suited to the existing installation space

Reduced cabling requirements helped improve installation cost efficiency

Testing and commissioning completed before successful project handover

Infrastructure reference supporting a major passenger ferry terminal

VSD Upgrade EXISTING PUMP SYSTEM RETROFIT
CHW + CW CHILLED & CONDENSER WATER PUMPS
Ferry Terminal TRANSPORT INFRASTRUCTURE REFERENCE

Project Outcome

The Tanah Merah Ferry Terminal project was successfully completed and handed over to the customer. The replacement demonstrates Trans-Digi’s capability to deliver VSD upgrading works for existing transport infrastructure while balancing system compatibility, installation efficiency and lifecycle cost considerations.

With the terminal undergoing upgrading to support passenger capacity of more than three million passengers annually, reliable chilled-water and condenser-water operation forms an important part of maintaining comfortable terminal conditions for passengers and staff.

Have a similar project?

Send us your motor rating, voltage, application and quantity. We'll get back to you fast.