Existing VSD installation upgraded to Himel HAVSP Smart Pump Series VSDs
SUCCESS STORY | INFRASTRUCTURE | TRANSPORT TERMINAL
Tanah Merah Ferry Terminal
Himel HAVSP Smart Pump Series VSDs · Chilled-Water & Condenser-Water Pumps
Tanah Merah Ferry Terminal required an upgrade of its existing VSD installation serving the chilled-water and condenser-water pumps. Trans-Digi supplied, tested and commissioned Himel HAVSP Smart Pump Series VSDs, providing a more cost-effective replacement solution while supporting the terminal’s critical cooling infrastructure.
Project Overview
Tanah Merah Ferry Terminal is a major passenger ferry gateway serving regional routes from Singapore. As part of the terminal’s upgrading works, the existing VSDs controlling its chilled-water and condenser-water pumps were identified for replacement.
The requirement was for a more cost-effective VSD solution capable of reliably operating the existing pump systems while reducing ongoing maintenance requirements. The replacement also needed to integrate efficiently into the existing installation.
Solution Provided
Trans-Digi supplied Himel HAVSP Smart Pump Series VSDs for the chilled-water and condenser-water pump applications, together with testing and commissioning.
The HAVSP’s compact footprint helped simplify replacement of the existing European-brand VSDs within the available installation space. The replacement arrangement also enabled the project team to optimise cable requirements, helping reduce installation costs.
Following installation, Trans-Digi completed testing and commissioning to verify correct VSD operation and ensure the pump systems were ready for handover.
Replaced
Existing European-brand VSDs
Existing chilled-water & condenser-water pump installation
New installation
Himel HAVSP Smart Pump Series VSDs
Tested & commissioned
VSD Upgrade Within Existing Terminal Infrastructure
The project required the new VSDs to integrate with the terminal’s existing chilled-water and condenser-water pump systems while minimising modification to the installed infrastructure. The Himel HAVSP solution supported a straightforward retrofit approach and efficient project execution.
Key Project Highlights
Chilled-water and condenser-water pump applications serving the ferry terminal
Compact drive footprint suited to the existing installation space
Reduced cabling requirements helped improve installation cost efficiency
Testing and commissioning completed before successful project handover
Infrastructure reference supporting a major passenger ferry terminal
Project Outcome
The Tanah Merah Ferry Terminal project was successfully completed and handed over to the customer. The replacement demonstrates Trans-Digi’s capability to deliver VSD upgrading works for existing transport infrastructure while balancing system compatibility, installation efficiency and lifecycle cost considerations.
With the terminal undergoing upgrading to support passenger capacity of more than three million passengers annually, reliable chilled-water and condenser-water operation forms an important part of maintaining comfortable terminal conditions for passengers and staff.